[KABI]


KABI Abilene Regional Airport
(1,686 acres) Abilene, TX

Four Nearby Instrument Airports:
[KDYS] 9 W ; [T23] 28 NE ; [F56] 30 N ;
[77F] 32 SW ;
(ave. distance: 25 nm)

Total Based Aircraft: 125
(93 single-props, 19 multi-props)
(10 jets, 3 helicopters)
Operations & ATC:
(ave. 142 ops/day … with 73,605 enplanements in 2012)
24hr FAA towerFAA staffing as of 9/24/11: 26
FAA compiles ATADS data for this facility. Airport operations in 2012 were DOWN 25% vs. 2007 operations, and DOWN 42% from the peak year (1992).

KABI search (aiR) METAR AIRNAV WIKI
FlightAware.com FlightStats.com

Airport Funding:
Four-year average AIP funding: $6,974,090 per year. Last AIP was Grant Sequence #43: $8,597,558 for “Rehabilitate Runway 17L/35R [Phase I – Design], Rehabilitate Taxiway [Taxiways”M”,”N”and”P”, Phase II (Construction)]”
— Average AIP Subsidy is $134 per operation.

6-4-2014

KABI


Scrollable aerial view at bing.com. Click here to open a new window with a FullView Image.