[KBMI]


KBMI Central Illinois Regional Airport at Bloomington-Normal
(1,968 acres) Bloomington-Normal, IL

Four Nearby Instrument Airports:
[2K0] 33 SE ; [C15] 35 W ; [KAAA] 27 SW ;
[KPNT] 30 NE ;
(ave. distance: 31 nm)

Total Based Aircraft: 80
(60 single-props, 9 multi-props)
(11 jets)
Operations & ATC:
(ave. 78 ops/day … with 274,677 enplanements in 2012)
16hr Contract tower
FAA compiles ATADS data for this facility. Airport operations in 2012 were DOWN 26% vs. 2007 operations, and DOWN 71% from the peak year (1992).

KBMI search (aiR) METAR AIRNAV WIKI
FlightAware.com FlightStats.com FlightRadar24.com

Airport Funding:
Four-year average AIP funding: $2,075,631 per year. Last AIP was Grant Sequence #62: $603,650 for “Acquire Friction Measuring Equipment, Acquire Snow Removal Equipment”
— Average AIP Subsidy is $73 per operation.

6-4-2014

KBMI


Scrollable aerial view at bing.com. Click here to open a new window with a FullView Image.