KGON Groton-New London Airport
(489 acres) Groton (New London), CT
Four Nearby Instrument Airports:
[0B8] 5 S ; [KWST] 11 E ; [KMTP] 16 S ;
[KSNC] 21 W ;(ave. distance: 13 nm)
Total Based Aircraft: 33
(20 single-props, 6 multi-props)
(4 jets, 1 helicopter, 2 military aircraft )
Operations & ATC:
(est. 98 ops/day ♦ 15hr Contract tower)
FAA compiles ATADS data for this facility. Airport operations in 2012 were DOWN 32% vs. 2007 operations, and DOWN 74% from the peak year (1990).
KGON search (aiR) METAR AIRNAV WIKI
FlightAware.com FlightStats.com
Airport Funding:
Four-year average AIP funding: $2,347,332 per year. Last AIP was Grant Sequence #28: $405,000 for “Acquire Snow Removal Equipment”
— Average AIP Subsidy is $66 per operation.
6-4-2014
Scrollable aerial view at bing.com. Click here to open a new window with a FullView Image.