[KPBI]


KPBI Palm Beach International Airport
(2,120 acres) West Palm Beach, FL

Four Nearby Instrument Airports:
[KLNA] 5 S ; [F45] 12 NW ; [KBCT] 18 S ;
[06FA] 18 NW ;
(ave. distance: 13 nm)

Total Based Aircraft: 136
(10 single-props, 7 multi-props)
(104 jets, 15 helicopters)
Operations & ATC:
(ave. 367 ops/day … with 2,958,416 enplanements in 2012)
24hr FAA towerFAA staffing as of 9/24/11: 44
FAA compiles ATADS data for this facility. Airport operations in 2012 were DOWN 29% vs. 2007 operations, and DOWN 43% from the peak year (1990).

KPBI search (aiR) METAR AIRNAV WIKI
FlightAware.com FlightStats.com FlightRadar24.com

Airport Funding:
Four-year average AIP funding: $1,701,989 per year. Last AIP was Grant Sequence #57: $708,316 for “Conduct Miscellaneous Study [Obstruction Survey], Construct Taxiway [Construct Taxilane – North and South (Design)], Improve Terminal Building [Design]”
— Average AIP Subsidy is $13 per operation.

6-4-2014

KPBI


Scrollable aerial view at bing.com. Click here to open a new window with a FullView Image.