ARKANSAS: Airport Data & Links


KLIT Bill and Hillary Clinton National Airport (Adams Field)
(2,000 acres) Little Rock, AR

Four Nearby Instrument Airports:
[KORK] 6 N ; [KLRF] 12 N ; [KSUZ] 15 SW ;
[KCWS] 23 NW ;
(ave. distance: 14 nm)

Total Based Aircraft: 160
(70 single-props, 36 multi-props)
(49 jets, 5 helicopters)
Operations & ATC:
(ave. 301 ops/day … with 1,097,403 enplanements in 2012)
24hr FAA towerFAA staffing as of 9/24/11: 35
FAA compiles ATADS data for this facility. Airport operations in 2012 were DOWN 41% from the peak year (2004).

KLIT search (aiR) METAR AIRNAV WIKI
FlightAware.com FlightStats.com FlightRadar24.com

Airport Funding:
Four-year average AIP funding: $4,316,938 per year. Last AIP was Grant Sequence #80: $5,124,468 for “Acquire Miscellaneous Land [Phase 2], Rehabilitate Runway Lighting [Edge, Touchdown Zone, & Centerline Lighting] – 04L/22R, Rehabilitate Taxiway Lighting [Taxiway Centerline]”
— Average AIP Subsidy is $39 per operation.

6-4-2014

KASG Springdale Municipal Airport
(228 acres) Springdale, AR

Four Nearby Instrument Airports:
[KFYV] 11 S ; [KXNA] 11 NW ; [KVBT] 11 NW ;
[KROG] 12 N ;
(ave. distance: 11 nm)

Total Based Aircraft: 104
(70 single-props, 21 multi-props, 4 gliders & ultralights)
(4 jets, 5 helicopters)
Operations & ATC:
(est. 171 ops/day (45% local) 15hr Contract tower)
FAA began compiling ATADS data in 2000. Airport operations in 2012 were DOWN 59% from the peak year (2005).

KASG search (aiR) METAR AIRNAV WIKI
FlightAware.com FlightStats.com

Airport Funding:
Four-year average AIP funding: $85,808 per year. Last AIP was Grant Sequence #16: $234,498 for “Install Perimeter Fencing, Install Runway Vertical/Visual Guidance System [Runway 18 PAPI] – 18/36, Install Weather Reporting Equipment”

6-4-2014

KARG Walnut Ridge Regional Airport
(1,800 acres) Walnut Ridge, AR

Four Nearby Instrument Airports:
[M70] 7 N ; [KPGR] 20 E ; [4M9] 21 NE ;
[KJBR] 22 SE ;
(ave. distance: 18 nm)

Total Based Aircraft: 15
(14 single-props, 1 multi-prop)

Operations & ATC:
(est. 168 ops/day (88% local) No tower)

KARG search (aiR) METAR AIRNAV WIKI
FlightAware.com FlightStats.com

Airport Funding:
Four-year average AIP funding: $147,882 per year. Last AIP was Grant Sequence #12: $512,805 for “Improve Airport Drainage, Rehabilitate Taxiway”

6-4-2014

M32 Lake Village Municipal Airport
(50 acres) Lake Village, AR

Four Nearby Instrument Airports:
[7M1] 17 N ; [KGLH] 18 NE ; [KLLQ] 28 NW ;
[KCRT] 30 W ;
(ave. distance: 23 nm)

Total Based Aircraft: 11
(7 single-props, 3 multi-props)
(1 jet)
Operations & ATC:
(est. 151 ops/day (76% local) No tower)

M32 search (aiR) METAR AIRNAV WIKI
FlightAware.com FlightStats.com

Airport Funding:
Four-year average AIP funding: $163,712 per year. Last AIP was Grant Sequence #9: $204,889 for “Extend Runway 01/19 [Construction Phase I – Grading and Drainage]”

6-4-2014

KAWM West Memphis Municipal Airport
(494 acres) West Memphis, AR

Four Nearby Instrument Airports:
[M01] 10 NE ; [KMEM] 14 SE ; [2M8] 17 NE ;
[KNQA] 22 NE ;
(ave. distance: 16 nm)

Total Based Aircraft: 115
(86 single-props, 21 multi-props)
(4 jets, 4 helicopters)
Operations & ATC:
(est. 138 ops/day No tower)

KAWM search (aiR) METAR AIRNAV WIKI
FlightAware.com FlightStats.com

Airport Funding:
Four-year average AIP funding: $2,865,612 per year. Last AIP was Grant Sequence #24: $10,000,000 for “Rehabilitate Runway – 17/35”
— Average AIP Subsidy is $57 per operation.

6-4-2014

KXNA Northwest Arkansas Regional Airport
(2,184 acres) Bentonville, AR

Four Nearby Instrument Airports:
[KVBT] 6 NE ; [5M5] 8 NW ; [KSLG] 10 SW ;
[KASG] 11 SE ;
(ave. distance: 9 nm)

Total Based Aircraft: 8
(1 single-prop, 3 multi-props)
(4 jets)
Operations & ATC:
(ave. 113 ops/day … with 549,195 enplanements in 2012)
18hr Contract tower
FAA began compiling ATADS data in 2000. Airport operations in 2012 were DOWN 21% from the peak year (2007).

KXNA search (aiR) METAR AIRNAV WIKI
FlightAware.com FlightStats.com FlightRadar24.com

Airport Funding:
Four-year average AIP funding: $18,318,603 per year. Last AIP was Grant Sequence #47: $3,430,505 for “Acquire Equipment, Expand Terminal Building [Phase 7], Update Airport Master Plan Study, Widen Taxiway”
— Average AIP Subsidy is $444 per operation.

6-4-2014

KFSM Fort Smith Regional Airport
(1,359 acres) Fort Smith, AR

Four Nearby Instrument Airports:
[KJSV] 22 W ; [KRKR] 23 SW ; [7M5] 28 E ;
[KGZL] 36 W ;
(ave. distance: 27 nm)

Total Based Aircraft: 102
(54 single-props, 16 multi-props)
(10 jets, 1 helicopter, 21 military aircraft )
Operations & ATC:
(ave. 95 ops/day … with 83,902 enplanements in 2012)
18hr FAA towerFAA staffing as of 9/24/11: 31
FAA compiles ATADS data for this facility. Airport operations in 2012 were DOWN 43% vs. 2007 operations, and DOWN 54% from the peak year (1992).

KFSM search (aiR) METAR AIRNAV WIKI
FlightAware.com FlightStats.com

Airport Funding:
Four-year average AIP funding: $1,337,152 per year. Last AIP was Grant Sequence #41: $2,868,007 for “Rehabilitate Taxiway [Taxiway”A”West Rehabilitation, Phase 2 of 3]”
— Average AIP Subsidy is $39 per operation.

6-4-2014

KROG Rogers Municipal Airport – Carter Field
(460 acres) Rogers, AR

Four Nearby Instrument Airports:
[KVBT] 6 W ; [KXNA] 11 SW ; [KASG] 12 S ;
[5M5] 16 W ;
(ave. distance: 11 nm)

Total Based Aircraft: 120
(74 single-props, 15 multi-props)
(28 jets, 3 helicopters)
Operations & ATC:
(est. 88 ops/day 14hr Contract tower)
FAA began compiling ATADS data in 2005. Airport operations in 2012 were DOWN 44% from the peak year (2006).

KROG search (aiR) METAR AIRNAV WIKI
FlightAware.com FlightStats.com

Airport Funding:
Four-year average AIP funding: $356,770 per year. Last AIP was Grant Sequence #32: $67,500 for “Wildlife Hazard Assessments”
— Average AIP Subsidy is $11 per operation.

6-4-2014

KSRC Searcy Municipal Airport
(330 acres) Searcy, AR

Four Nearby Instrument Airports:
[KHBZ] 23 NW ; [4M3] 24 S ; [KLRF] 27 SW ;
[KBVX] 31 N ;
(ave. distance: 26 nm)

Total Based Aircraft: 122
(75 single-props, 24 multi-props, 6 gliders & ultralights)
(2 jets, 15 helicopters)
Operations & ATC:
(est. 87 ops/day (63% local) No tower)

KSRC search (aiR) METAR AIRNAV WIKI
FlightAware.com FlightStats.com

Airport Funding:
Four-year average AIP funding: $109,377 per year. Last AIP was Grant Sequence #20: $149,688 for “Improve Airport Drainage [Design and Construct Draiage Improvements], Rehabilitate Taxiway [Rehabilitate Taxiway E and Construct Subsurface Drains on Ramp]”

6-4-2014

KHOT Memorial Field Airport
(844 acres) Hot Springs, AR

Four Nearby Instrument Airports:
[M78] 19 SE ; [KADF] 23 S ; [KSUZ] 31 E ;
[KMPJ] 41 N ;
(ave. distance: 29 nm)

Total Based Aircraft: 77
(55 single-props, 17 multi-props, 1 gliders & ultralights)
(4 jets)
Operations & ATC:
(est. 82 ops/day No tower)

KHOT search (aiR) METAR AIRNAV WIKI
FlightAware.com FlightStats.com

Airport Funding:
Four-year average AIP funding: $788,074 per year. Last AIP was Grant Sequence #21: $123,597 for “Install Airfield Guidance Signs, Wildlife Hazard Assessments”
— Average AIP Subsidy is $26 per operation.

6-4-2014

KFYV Drake Field
(631 acres) Fayetteville, AR

Four Nearby Instrument Airports:
[KASG] 11 N ; [KXNA] 18 N ; [KSLG] 19 NW ;
[KVBT] 21 N ;
(ave. distance: 17 nm)

Total Based Aircraft: 98
(76 single-props, 12 multi-props)
(6 jets, 4 helicopters)
Operations & ATC:
(est. 79 ops/day (40% local) 16hr Contract tower)
FAA compiles ATADS data for this facility. Airport operations in 2012 were DOWN 2% vs. 2007 operations, and DOWN 34% from the peak year (1998).

KFYV search (aiR) METAR AIRNAV WIKI
FlightAware.com FlightStats.com

Airport Funding:
Four-year average AIP funding: $99,882 per year. Last AIP was Grant Sequence #41: $104,828 for “Rehabilitate Apron [Rehabilitate Apron]”

6-4-2014

KTXK Texarkana Regional Airport -Webb Field
(964 acres) Texarkana, AR

Four Nearby Instrument Airports:
[M18] 23 NE ; [KATA] 23 SW ; [M77] 33 N ;
[3F4] 36 S ;
(ave. distance: 29 nm)

Total Based Aircraft: 54
(31 single-props, 7 multi-props)
(11 jets, 5 helicopters)
Operations & ATC:
(ave. 76 ops/day … with 26,690 enplanements in 2012)
16hr Contract tower
FAA compiles ATADS data for this facility. Airport operations in 2012 were DOWN 9% vs. 2007 operations, and DOWN 50% from the peak year (1990).

KTXK search (aiR) METAR AIRNAV WIKI
FlightAware.com FlightStats.com

Airport Funding:
Four-year average AIP funding: $760,404 per year. Last AIP was Grant Sequence #37: $58,500 for “Conduct Miscellaneous Study [Runway 4/22 Pavement Evaluation]”
— Average AIP Subsidy is $27 per operation.

6-4-2014

Other Selected Arkansas Airports…

Town CODE Airport Name Acreage Based Acft OPS/day
Carlisle 4M3 Carlisle Municipal Airport 640 ac 14 132
Benton KSUZ Saline County Regional Airport (?) ac 33 185
North Little Rock KORK North Little Rock Municipal Airport 621 ac 150 102
Batesville KBVX Batesville Regional Airport 398 ac 53 96
Helena/West Helena KHEE Thompson-Robbins Airport 610 ac 42 96
Corning 4M9 Corning Municipal Airport 135 ac 18 91
Mountain Home KBPK Baxter County Airport 346 ac 49 74
Siloam Springs KSLG Smith Field Airport 270 ac 42 66
El Dorado KELD South Arkansas Regional Airport at Goodwin Field 1,540 ac 22 60
Jonesboro KJBR Jonesboro Municipal Airport 1,000 ac 119 55
Conway KCWS Dennis F Cantrell Field Airport 198 ac 42 44
Sheridan 9M8 Sheridan Municipal Airport 152 ac 15 24
Harrison KHRO Boone County Airport 425 ac 52 24
Hope M15 Hope Municipal Airport 1,575 ac 26 22