[ARCHIVE] 2017-03-30: Final Draft, Washington Aviation System Plan (WASP)

Click on the dates below to view and/or download PDF copies:

DATE TITLE – Description
3/30/2017 2017 WASP Final Draft, Ch.1 thru Ch.9, combined

253-pages
3/30/2017 2017 WASP Final Draft, Appendices

128-pages
7/1/2009 2009 WASP Report

This is the previous version of the WASP report, measuring 253-pages. A page inside the front cover notes FAA funds were used. Projected traffic volumes for commercial airports in 2015 were all well above volumes that actually happened.
PAGE CREATED: 2017-03-30