[ARCHIVE] 2017-03-30: Final Draft, Washington Aviation System Plan (WASP)

The 128-page Appendices include the following:

  • App.A – Glossary of Terms
  • App.B – Emerging Issues Paper: Aerospace Manufacturing (starts at p.21)
  • App.B – Emerging Issues Paper: Aircraft Fuels (starts at p.28)
  • App.B – Emerging Issues Paper: Aircraft Innovation (starts at p.41)
  • App.B – Emerging Issues Paper: Contract Tower Funding Challenges (starts at p.49)
  • App.B – Emerging Issues Paper: Decline in General Aviation Activity (starts at p.57)
  • App.B – Emerging Issues Paper: General Aviation Infrastructure Funding Challenges (starts at p.64)
  • App.B – Emerging Issues Paper: Preparing Airports for NextGen Implementation (starts at p.73)
  • App.B – Emerging Issues Paper: UAS in Washington State (starts at p.78)
  • App.C – Proposed WASP Airport Classification Results (starts at p.119)
Click on the image below for a scrollable view; the PDF file may be downloaded.